WF SKŘIPOVÁ

3 x ENERCON E147 EP5 – 5,0 MW, hub height 125 m
eventually 3 x ENERCON E138 EP3 – 4,2 MW, hub height 130 m

LOCATION

Project plan in the Karlovy Vary region, launched in 2021, located in the cadastral municipality Skřipová, has the altitude ranging from 550 m to 570 m above sea level.

PROJECT DATA

  • 3 x ENERCON E 147 EP5/5,0 MW, 125 m hub height, 147 m diameter rotor,
  • eventually 3 x ENERCON E 138 EP3/4,2 MW, 130 m hub height, 138 m diameter rotor.
  • Consent of the village with the investment plan.
  • Contractually secured land for construction.
  • EIA – Environmental Impact Assessment – submitted to the Regional Authority for consideration.
  • Based on the opinion of the RA on the EIA, a change in the zoning plan will be initiated.
  • Planning permission – expected in 2024.
  • Building permit – expected in 2024.
  • Construction of the wind farm in 2025 .
  • Expected yearly power generation approx. 25 000 000 kWh. 

COMMISSIONING

The construction of wind farm is expected in 2025.